What the analogue phone switch-off means for a dental or aesthetics clinic.

If your clinic still has a traditional landline, you will have heard that the old phone network is being closed. This guide explains what is confirmed, what is not, and what to do this month.

Updated 16 November 2026

What is being retired

The old analogue network is called the public switched telephone network, or PSTN. It carries calls over copper lines from the exchange to your premises. It is being replaced by phone calls that travel over the internet, often called digital voice or VoIP. The line may stay in the ground for broadband, but the old phone service that runs on it is being closed.

What is officially confirmed, and what is not

The government has not set a legal switch-off date. Its guidance says the move is industry-led, not a government programme. It says most customers are expected to have switched by the end of January 2027, and that not every analogue service will necessarily end in 2027. Customers are told to ask their own provider when they must move.

The firm date comes from the network owner. Openreach, which runs the copper network, said in February 2026 that BT Group will retire the network by 31 January 2027, and described the deadline as locked. Openreach has repeated since, including in November 2026, that the date is not moving.

So the accurate summary is this: 31 January 2027 is the date Openreach is working to, and the government guidance describes it as the expected point by which most customers will have moved. It is not written into law as a deadline. The government's published charter on the programme is voluntary and contains no switch-off date of its own.

Openreach has also said some lines that have not moved will not simply go dead on that date. A limited emergency voice service is reported to be available from 1 February 2027, at a higher wholesale price, and it cannot be ordered in advance. Treat it as a last resort, not a plan. Ask your provider whether it applies to you.

The scale is still large. In early November 2026 Openreach was reported as saying around 300,000 lines at business premises still had to move.

Why a clinic should not wait

Three reasons.

Prices. Openreach said the wholesale price of its legacy line rental rose in stages through 2026. Your own bill may already reflect this.

Notice and queues. The voluntary charter says providers should give direct customers at least 60 days' notice of a change that affects them. That is a promise about notice, not a guarantee of a convenient date, and engineers become scarce as a deadline approaches.

What else is on the line. Providers do not know which devices you have plugged into your lines. That is for you to find out.

What in a clinic may depend on the old line

Walk round the building and look for anything connected to a phone socket. Typical items:

  • Reception and surgery handsets, and any switchboard.
  • Card payment machines.
  • Intruder and fire alarms that call a monitoring centre.
  • Door entry systems.
  • Lift emergency phones.
  • Fax machines, if you still have one.
  • Any telecare or lone-worker alarm.
  • Broadband on the same line.

The government says such devices may need to be upgraded, given their own battery and network backup, or connected through an adaptor, and advises checking with the supplier before buying a new alarm that it works over internet voice or mobile.

Power cuts and 999

An old analogue handset could keep working in a local power cut. A digital line cannot carry power, so handsets and routers stop unless they have a backup. Ofcom's guidance says providers should offer at least one solution giving at least one hour of access to emergency services during a power cut, free to customers at risk. Providers must keep emergency calls available.

For a clinic, this matters. A reception phone that is the only way to reach 999 is the case to think about. A charged mobile phone kept at reception is a common back-up. Ask your provider what it offers and write down the answer.

What to do, in order

  1. Ask your provider two questions. When must my lines move, and what are my options? Get the reply in writing.
  2. List every device on your lines. Use the walk-round above. Ask each supplier whether the device works over internet voice.
  3. Check your contract. Note the end date and any notice needed. If you are tied in, ask whether the move changes the terms.
  4. Check your internet. Digital voice depends on your broadband. Is it reliable enough, and does it have a backup?
  5. Plan the power-cut position. Decide what you will use if the power or internet fails.
  6. Plan the cutover. Choose a date outside surgery hours, and keep your practice numbers. Ask whether your numbers can move.
  7. Tell your team. Show reception what changes, including how to use any new handset or app.
  8. Test before you rely on it. Make test calls in and out, test card machines and alarms, and test a call to the monitoring centre.

Where Foxi fits

Foxi supplies cloud phone systems, broadband and mobile to UK dental practices and aesthetics clinics. You keep your existing numbers, every broadband connection comes with a 5G backup connection, and the move to digital can also bring call recording, transcription and a missed-call list. If you would like to talk through your own situation, book a demo or email hello@wearefoxi.co.uk. Whichever provider you choose, ask them the questions above.